6600036361 |
LANDING BASE INSPECTION (LBI) |
NGPD, SAUDI ARAMCO |
NGPD |
May-2020 |
6400052312 |
Repair and reconditioning of Pipelines |
Saudi Aramco |
Abqaiq, Aindar & Shedgum |
Dec-2006 |
6600015777 |
Pipeline repair and reconditioning |
Saudi Aramco |
NGPD |
May-2011 |
6600018972 |
Concrete Repair Services |
Saudi Aramco |
NGPD & QSWD |
Aug-2012 |
85054–70 |
Renovation of Western & Eastern Toilets at Faraz |
SCECO |
Faraz & Uthmaniyah Power Plant |
Dec-1994 |
400384–009 |
Radio Workshop |
Saudi Aramco |
Udhailiyah |
Jun-1993 |
400465–002 |
Fabricate ad Install Platforms |
Saudi Aramco |
Ain Dar GOSP #1 |
May-1994 |
400384–049 |
Tanajib Plant & Marine A/C |
Saudi Aramco |
Tanajib Plant & Mar. Coms. Sites |
Oct-1996 |
400534–002 (R1) |
External Fire Protection |
Saudi Aramco |
SHGP Substation R42–P6, R42–P7 |
Nov-1997 |
400311–094 |
Provide Pipe Fitter for Ain Dar Area |
Saudi Aramco |
Ain Dar Area |
Dec-1997 |
400502–076 |
Construct Fireproofing of Substation |
Saudi Aramco |
Electrical Plant, Abqaiq Plant |
Sep-1997 |
400553–025 |
Repair / Replace Faulty Anodes |
Saudi Aramco |
Shedgum Gas Plant |
Jul-1998 |
400552–021 |
Modification Flare Drip Leg |
Saudi Aramco |
Plant – 120 Abqaiq Plants |
Jul-1998 |
400501–054 (R1) |
Upgrade Road and Reinforce Well Pad |
Saudi Aramco |
Hawtah Field |
Oct-1998 |
41201/00 |
Repair of Electrodialysis Building at Uthmaniyah Gas |
Saudi Aramco |
Uthmaniyah Gas Plant |
Jan-2000 |
400552–046 |
Substation 15/20 Metal Doors |
Saudi Aramco |
Abqaiq Plants |
May-1999 |
400621–027 |
Construct Two Engineering Offices |
Saudi Aramco |
Abqaiq GOSP #5 & #6 |
Dec-2001 |
400604–019 |
LAN Connection & Asphalt Paving |
Saudi Aramco |
Shedgum Gas Plant |
Oct-2001 |
400621–029 |
Demolish and Remove Abandoned Stations |
Saudi Aramco |
Abqaiq |
May-2001 |
400635–064/ 6140063564 |
Substation #17 & #27 Loads Diversification, Plant |
Saudi Aramco |
Abqaiq Plants |
Dec-2002 |
400635–064/ 6140063564 |
Substations – 17 & 27 Loads Diversification, Plant |
Saudi Aramco |
Abqaiq Plants |
Jun-2002 |
400337–035 |
Dry Storage Warehouse Modifications |
Saudi Aramco |
QSWTP |
Sep-1993 |
400425–098 |
Excavate Buried Supports |
Saudi Aramco |
APS #7, Abqaiq Plants |
Sep-1994 |
400359–074 |
HPS Area Concrete Repairs |
Saudi Aramco |
QSWTP |
Oct-1994 |
400424–040 (R1) |
Relocation of Two– (2) Portables to Abqaiq |
Saudi Aramco |
Harmaliyah/Abqaiq |
Feb-1995 |
400440–068 |
Re – Slope ED Building Floor |
Saudi Aramco |
Uthmaniyah Gas Plant |
Sep-1994 |
400440–065 |
Construct Foundation Sun Shield |
Saudi Aramco |
Uthmaniyah Gas Plant |
Sep-1994 |
400465–016 (R1) |
Fabricate and Install Platforms |
Saudi Aramco |
Ain Dar GOSP #1 |
Sep-1994 |
400439–039 (R1) |
Fabrication Shop Construction |
Saudi Aramco |
Hawiyah GOSP–2 Support Unit Yard |
Oct-1995 |
400465–067 |
Construct A Platform |
Saudi Aramco |
Ain Dar GOSP #3 |
Oct-1995 |
400495–007 |
Process Area Flooring & Foundations |
Saudi Aramco |
QSWTP |
Nov-1996 |
400502–025 |
Repair /Replace Concrete Foundation |
Saudi Aramco |
South Steam Area Abqaiq Plant |
Oct-1996 |
400561–020 |
Fabricate Sixty– (60) Ladders for Rectifiers |
Saudi Aramco |
Contractor’s Yard |
Sep-1998 |
400632–043 |
Launcher & Receiver Piping Modification |
Saudi Aramco |
UWIPS #4 & #5 |
Aug-2001 |
400566–067 |
Repair U/Ground Leak |
Saudi Aramco |
Abqaiq Plants |
Aug-2001 |
6140062014 (R1) |
Install Two Jib Cranes for R/V Shop |
Saudi Aramco |
UDH. UTC BLDG |
Oct-2001 |
6600004161 |
Construct Oily Water Treatment System @ Yanbu |
Saudi Aramco |
Yanbu Crude Oil Terminal |
Jul-2003 |
400300–092 |
Replace Underground Electrical Cables |
Saudi Aramco |
Udhailiyah Camp |
Dec-1992 |
400418–032 |
Replace 8” Diameter RW Piping |
Saudi Aramco |
Dhahran Main Camp |
Jan-1994 |
400472–034 |
Fabricate and Install Platforms |
Saudi Aramco |
APS 4 & 5, Abqaiq Plants |
Dec-1994 |
400483–015 |
Renovate Exterior Walls of Carpenter ad Paint Shop |
Saudi Aramco |
CMD Abqaiq |
Dec-1994 |
400472–036 |
Fabricate and Install Supports |
Saudi Aramco |
North Stabilizer, Abqaiq Plants |
Dec-1994 |
400440–079 |
Installation of Unloading Pump |
Saudi Aramco |
RMU Plant, Uth. Gas Plant |
Jan-1995 |
400472–035 |
Fabricate & Install Platforms |
Saudi Aramco |
UA Spheroid, Abqaiq Plants |
Dec-1994 |
400472–078 |
PCV 7A / B Power Supply |
Saudi Aramco |
UA Spheroid, Abqaiq Plants |
Feb-1996 |
400472–083 |
Fabricate and Install Cable Tray |
Saudi Aramco |
North Stab., Abqaiq Plants |
Jan-1996 |
400490–048 (R2) |
Ain Dar GOSP #1 Header Extension |
Saudi Aramco |
Ain Dar GOSP #1 |
Mar-1996 |
400469–087 |
Fabricate and Install Walkways |
Saudi Aramco |
Abqaiq GOSP #5 |
Jan-1996 |
400359–099 (R1) |
Concrete Cable Trench Repair |
Saudi Aramco |
QSWTP |
Sep-1996 |
400507–058 |
HPPT R/V Platform Extension |
Saudi Aramco |
Ain Dar GOSP – 2 |
Dec-1996 |
400266–008 |
Redesign Safety Bulletin Boards |
Saudi Aramco |
North & South Gates, Abqaiq Plant |
Dec-1996 |
400510–061 |
Fabrication Wooden Plugs |
Saudi Aramco |
Shedgum Gas Plant |
Dec-1996 |
400502–036 |
Install Min. Flow Recycle System |
Saudi Aramco |
North Steam Plant @ Abqaiq Plant |
Apr-1997 |
400534–046 |
Concrete Foundation Repair |
Saudi Aramco |
Sulfur Area, Shdgm. Gas Plant |
Feb-1998 |
400502–095 |
Reducing Station #2 Upgrade |
Saudi Aramco |
North Steam Plant Abqaiq Plant |
Feb-1998 |
400529–073 |
Relocate Cathodic Protection Anodes |
Saudi Aramco |
Uthmaniyah Gas Plant |
Jan-1998 |
400397–061 |
Install Transformers & Resistors |
Saudi Aramco |
Plant – 111, Abqaiq Plants |
Mar-1993 |
400384–008 |
Civil Expansion of Building – 316B |
Saudi Aramco |
Dhahran |
Mar-1993 |
400459–002 (R1) |
Fabricate and Install Labels |
Saudi Aramco |
N/Steam Plant, Abqaiq Plants |
Apr-1994 |
400431–004 |
Laboratory Interior Renovation |
Saudi Aramco |
Abqaiq Laboratory |
Mar-1994 |
400502–006 |
Removal of Abandoned Equipment |
Saudi Aramco |
Air & Water Plant, Abqaiq Plants |
Mar-1996 |
400502–004 (RA) |
Boiler – 9 Stack Foundation Repair |
Saudi Aramco |
North Steam Plant Abqaiq Plant |
Apr-1996 |
400356–074 |
Install Gaitronics System at UWIP–1 |
Saudi Aramco |
UWIP #1 |
Apr-1997 |
400507–039 (R1) |
Relocation of Sour Water Pit |
Saudi Aramco |
Ain Dar GOSP #4 |
Jun-1997 |
400267–073 (R1) |
AAA Garage Electrical Upgrade |
Saudi Aramco |
Udhailiyah Camp |
Mar-1998 |
400572–011 |
Replace Shedgum & Udhailiyah A/C System |
Saudi Aramco |
Shedgum & Udhailiyah |
Aug-1999 |
400616–003 |
Construction of Coating / Blasting Shops |
Saudi Aramco |
CGMSD Fabrication Shop |
May-2001 |
6140064292 |
ESD Modifications / Sulphur Train–1 / UGP |
Saudi Aramco |
Uthmaniyah Gas Plant |
Apr-2002 |
6140064292 (R1) |
ESD Modification / Sulphur Train–1/ UGP |
Saudi Aramco |
Uthmaniyah Gas Plant |
May-2002 |
400420–002 |
Install Anchors |
Saudi Aramco |
Sub – 50, Abqaiq Plants |
Jan-1993 |
400379–044 (R1) |
Upgrade PZV Workshop |
Saudi Aramco |
Shedgum Gas Plant |
Apr-1993 |
400362–090 |
Fabricate and Install Platforms |
Saudi Aramco |
Ain Dar GOSP #4 |
Feb-1994 |
400469–045 (R1) |
Construct Concrete Foundation |
Saudi Aramco |
Abqaiq GOSP #2 |
Mar-1995 |
400046–057 |
Fazran and Ain Dar GOSP #6 Termicide |
Saudi Aramco |
Fazran & ADG–6 Com. Sites |
Apr-1995 |
400459–099 |
Repair Concrete Foundations |
Saudi Aramco |
North Steam Plant, Abqaiq Plants |
Mar-1996 |
400397–068 |
Replace Motor Starter |
Saudi Aramco |
N/Steam Plant, Abqaiq Plants |
Apr-1993 |
400518–034 (R1) |
Replacement of Two– (2) 1½” Ball Valves |
Saudi Aramco |
Ain Dar – 1 & 3 SWD System |
May-1997 |
400507–095 |
Repair Underground Water Leak |
Saudi Aramco |
K–201ASKID, Ain Dar GOSP #4 |
Mar-1997 |
400502–090 |
Installation of Cathodic Protection |
Saudi Aramco |
Air & Water Plant, Abqaiq Plants |
May-1997 |
400267–085 (R1) |
Install Parking Sunshade |
Saudi Aramco |
Udhailiyah Admin. Building |
Apr-1999 |
400290–063 (R3) |
Construct Offices |
Saudi Aramco |
Ain Dar Field Services Building |
Mar-1994 |
400290–071 |
Install Conduits Radios and Telephones |
Saudi Aramco |
Field Srvcs. Bldg, Shedgum |
Jul-1994 |
400469–006 |
Fabrication and Installation of 2” Ø Flushing Line |
Saudi Aramco |
Abqaiq GOSP #2 |
Jul-1994 |
400459–031 (R1) |
Replace Deaerator E – 28 Funnel |
Saudi Aramco |
North Steam Plant, Abqaiq Plant |
Oct-1994 |
400423–036 |
Fabricate and Install Jib Cranes |
Saudi Aramco |
APS – 7, Abqaiq Plants |
Sep-1994 |
400440–062 (R2) |
Repair and Renovate Burn Pit |
Saudi Aramco |
Uthmaniyah Gas Plant |
Feb-1995 |
400425–081 |
Construct Pipe Support |
Saudi Aramco |
PLT 110, N/Stabilizer, Abq |
Aug-1994 |
400420–054 (R1) |
Install Space Heater in T– 403/404 |
Saudi Aramco |
Shedgum WIP #3 |
Sep-1994 |
400472–061 |
Install CP Access Test Points |
Saudi Aramco |
Tank Farm, Abqaiq Plants |
Jul-1995 |
400444–088 (R1) |
Fabricate Pipeline for Fire Monitor |
Saudi Aramco |
Shedgum GOSP #4 |
Aug-1995 |
400384–037 |
Hammam at Qatif Junction |
Saudi Aramco |
Qatif Junction Communication Site |
Jan-1996 |
400356–057 |
Gaitronics Communication System Construction |
Saudi Aramco |
UWIP – 4 |
Sep-1995 |
400483–048 |
Renovation of Interior of Building 12–412 at Abqaiq |
Saudi Aramco |
Abqaiq Camp Building #12–412 |
Sep-1995 |
400502–023 (R2) |
Installation of Cathodic Protection |
Saudi Aramco |
Air & Water Plant, Abqaiq Plant |
Jan-1997 |
400487–030 |
Relocate AOV’s Instrument Airlines |
Saudi Aramco |
NGL, Abq Plants |
Jul-1996 |
400356–081 |
Install Gaitronics Syst. at UWIPS–3 |
Saudi Aramco |
Uthmaniyah WIPS – 3 |
Sep-1997 |
400529–011 |
Cathodic Protection Upgrade |
Saudi Aramco |
Uthmaniyah Gas Plant |
Sep-1997 |
400553–053 |
Excavation to Replace Cable |
Saudi Aramco |
Shedgum Gas Plant |
Aug-1998 |
400673–026 (R1) |
Grounding Modifications, Substation #15, Plant – 120 |
Saudi Aramco |
South Stabilizer Abqaiq Plants |
Oct-2002 |
400469–004 (R1) |
Cable Excavation and Concrete Footings |
Saudi Aramco |
Abqaiq GOSP #6 |
Jul-1994 |
400376–072 |
Upgrade Air Conditioning Systems |
Saudi Aramco |
Abqaiq Plants |
Jul-1994 |
400425–086 (R1) |
Construct Lube Oil / Paint Shed |
Saudi Aramco |
PLT 110, N/Stabilizer, Abq |
Sep-1994 |
400440–042 (R1) |
Maintain Administration Building |
Saudi Aramco |
Uthmaniyah Gas Plant |
Oct-1994 |
400459–072 (R2) |
Fabricate Wooden Plugs |
Saudi Aramco |
South Steam Plant, Abq. Plants |
Jul-1995 |
400472–096 |
Fabricate & Install Pump Screens |
Saudi Aramco |
North Stabilizer, Abqaiq Plants |
Aug-1996 |
400311–097 |
Modification of Gas Tank 1 & 2, 7 LPG Tank |
Saudi Aramco |
Fire Trng. Center, Plant 206, Abqaiq |
Sep-1997 |
400651–015 |
Excavation to Repair Water Leaks, 10” RTR, Utilities |
Saudi Aramco |
Shedgum |
Jul-2001 |
6140061439 |
Waste Oil Recovery System Construction |
Saudi Aramco |
UGOSP – 9 |
Aug-2002 |
400621–046/ 6140062146 |
Modification of Existing R/V Platforms, HPPT D–100B |
Saudi Aramco |
Abqaiq GOSP #3 |
Aug-2002 |
400267–028 |
Udhailiyah Airport Clean – up |
Saudi Aramco |
Udh. Village & Udh. Airport Area |
Mar-1993 |
400359–047 +Change Order |
Intake & Transfer Area Concrete Repair |
Saudi Aramco |
QSWTP |
Jun-1993 |
400850–051 |
Mothball 98 Housing Units |
Saudi Aramco |
Abqaiq Camp |
May-1994 |
400470–045 |
Supply Experienced Pipe Fitters |
Saudi Aramco |
Shedgum Gas Plant |
Apr-1995 |
400490–076 |
Modification in SA P/L Cleaning Facilities |
Saudi Aramco |
Aqaiq Area |
Apr-1996 |
400472–068 |
Installation of Guardrails |
Saudi Aramco |
3 Phase Separator Area, Abqaiq Plants |
Apr-1996 |
400490–075 |
Modification in Saudi Aramco P/L Cleaning |
Saudi Aramco |
Uthmaniyah Area |
Apr-1996 |
400490–072 (R1) |
10” UTMN–1225 Jump Over to Uthmaniyah GOSP–4 |
Saudi Aramco |
UTMN – 1225 |
Jul-1996 |
400507–077 |
Making / Blocking New Existing Entrance |
Saudi Aramco |
ADGOSP #2 |
Apr-1997 |
400512–023 (R1) |
Modification Flare Drip Leg |
Saudi Aramco |
Plant – 120, Abqaiq Plants |
Apr-1998 |
400311–093 |
Provide Pipe Fitters for Abqaiq Area |
Saudi Aramco |
Abqaiq Area |
Jun-1997 |
400635–044 |
Construct New Guardrails |
Saudi Aramco |
Abqaiq Plants |
Jun-2001 |
6140064289 |
Upgrade Oily Water Sewer |
Saudi Aramco |
IOK Utilities Plant, UGP |
Aug-2002 |
400630–034/ 6140063034 |
Clean The North Sediment Basin at QSWTP |
Saudi Aramco |
QSWTP |
Jun-2002 |
6140064289 |
Upgrade Oily Water Sewer at Sludge Catcher Area IOK |
Saudi Aramco |
IOK Utilities Plant, UGP |
Aug-2002 |
400651–061/ 6140065161 |
Rectify Items for Executive Review, SHDGM |
Saudi Aramco |
Plant Wide Shdgm. Gas Plant |
Apr-2002 |
400642–036 |
Upgrade Utilities Chemical Facilities |
Saudi Aramco |
Uthmaniyah Gas Plant |
Jun-2002 |
400376–054 (R1) |
Fabrication & Installation of PCV–505 Supports |
Saudi Aramco |
Abqaiq Plants |
Aug-1993 |
400440–047 (R1) |
Install Foundations K108B Comp. |
Saudi Aramco |
Uthmaniyah Gas Plant |
Aug-1994 |
400483–037 |
Renovation of Laboratory Room at Abqaiq Building |
Saudi Aramco |
Bldg. 9 – 311, Abqaiq Camp |
Jul-1995 |
400420–089 |
Construct Concrete Pad |
Saudi Aramco |
Abqaiq Main Camp |
Aug-1995 |
400524–034 |
Flare Line Expansion Loop Found |
Saudi Aramco |
UGOSP #9 |
Jun-1997 |
400518–051 |
Affix Acctg. Plant Tags & Removal of Sect. of |
Saudi Aramco |
Abqaiq – 3 F/L |
Sep-1997 |
400488–034 |
Demolition of Diesel Tank |
Saudi Aramco |
Abq. Bulk Plant, Plant – 279 |
Aug-1997 |
400534–005 |
Power Cable Layout on Cable Tray |
Saudi Aramco |
Shdgm. Gas Plant Utilities Area |
Jun-1997 |
400513–058 |
Shaybah AXL DCS/Isolation |
Saudi Aramco |
Abqaiq Plants |
May-1998 |
6140400632 |
Replacement of 24” Carbon Steel Pipe with 20” RTR |
Saudi Aramco |
UWIPS #4 |
Jun-2001 |
400469–082 (R1) |
Fabrication and Installation of Flow–Meter |
Saudi Aramco |
Abqaiq Well #145 |
Feb-1996 |
400225–086 |
Installation of Cable Tray |
Saudi Aramco |
Plant #462, Abqaiq Plants |
Nov-1992 |
400361–099 |
Vessel Cleaning T & I |
Saudi Aramco |
Shedgum GOSP #5 |
Dec-1993 |
400394–071 (R1) |
Choke Valves Installation |
Saudi Aramco |
Abqaiq, Ain Dar, & Shedgum Areas |
Mar-1994 |
400337–045 |
Renovate Offices MSO Warehouse |
Saudi Aramco |
QSWTP |
Jan-1994 |
400290–081 |
Installation of Wooden Sign Boards |
Saudi Aramco |
Ain Dar Area |
Dec-1994 |
400356–049 |
Concrete Foundation Repair |
Saudi Aramco |
UWIP – 5 |
Jan-1995 |
400420–074 (R1) |
Replace Transformer T – 601 |
Saudi Aramco |
Ain Dar Station #1 |
Apr-1995 |
400518–025 |
Installation of Guardrails |
Saudi Aramco |
Shedgum Field |
Nov-1996 |
400507–056 |
10” Gravity Sewer Line Replacement |
Saudi Aramco |
Ain Dar GOSP #1 |
Mar-1997 |
400513–049 |
Foundation Constructions |
Saudi Aramco |
Abqaiq Plants |
Feb-1998 |
400535–045 |
Platform Installation of GT – 1 |
Saudi Aramco |
Ain Dar WIP #1 |
Dec-1998 |
045335–052 (R1) |
Refurbish Building 101 at Udhailiyah Industrial Park |
Saudi Aramco |
Udhailiyah Industrial Park |
Feb-1999 |
400488–061 |
Office Renovation at Building 3017 |
Saudi Aramco |
Bldg. 3017, Old Abq. Rd., Dh. |
Dec-1998 |
42451/00 |
Construct Security Guardhouse at West Pier |
Saudi Aramco |
West Pier, Ras Tanura |
Dec-2000 |
6510010757 |
Construction of the Radiation Storage Pit |
Saudi Aramco |
Hawiyah Gas Plant |
Mar-2003 |
400362–027 |
Repair Fazran Security Building |
Saudi Aramco |
Fazran Security Building |
Oct-1992 |
400397–037 |
Fabricate and Install Sign – Boards |
Saudi Aramco |
Electrical Plant, Abqaiq Plants |
Oct-1992 |
400360–027 |
Fabricate and Install Walkways |
Saudi Aramco |
Abqaiq GOSP #2 & #6 |
Nov-1992 |
400362–029 |
Fabricate and Install Supports |
Saudi Aramco |
Ain Dar GOSP #1 |
Nov-1992 |
400360–026 |
Fabricate and Install Steel Platforms |
Saudi Aramco |
Abqaiq GOSP #5 |
Nov-1992 |
400337–038 |
Install Air Conditioning at UWSS – 1 |
Saudi Aramco |
UWSS – 1 |
Nov-1993 |
400337–044 |
24” Manholes for Tanks PLT 423 |
Saudi Aramco |
UWSS – 1 |
Dec-1993 |
400360–059 |
Certified Crane Operators |
Saudi Aramco |
Abqaiq GOSP #2 |
Nov-1993 |
400425–044 |
Clean Trenches Under Fin – Fans |
Saudi Aramco |
Abqaiq Plants |
Oct-1993 |
400469–019 |
Fabricate and Install Platforms |
Saudi Aramco |
Abqaiq GOSP #6 |
Oct-1994 |
400376–090 |
Fabricate and Install Barricades |
Saudi Aramco |
PLT – 332/337, NGL, Abq. Plant |
Nov-1994 |
400472–011 |
Fabricate and Install Guardrails |
Saudi Aramco |
Abqaiq Plants |
Nov-1994 |
400472–013 |
Construction of Concrete Supports |
Saudi Aramco |
Plant 142, APS#7, Abqaiq Plants |
Nov-1994 |
400472–013 |
Construction of Concrete Supports |
Saudi Aramco |
Plant 142, APS#7, Abqaiq Plants |
Nov-1994 |
400384–025 |
Pump St. #2 Stand–By A/C Upgrade |
Saudi Aramco |
Pump St. – #2 |
Mar-1995 |
400465–078 (R1) |
Fire – Water System Piping Replacement |
Saudi Aramco |
Ain Dar GOSP #1 |
Feb-1996 |
400539–014 (R1) |
External Fire Proofing of Substations |
Saudi Aramco |
Abqaiq Plants |
Feb-1998 |
400501–065 |
Upgrade Road & Reinforce Well pad |
Saudi Aramco |
Hawtah Field |
Jan-1999 |
400635–041 |
Installation of Instrument Air Dryer, Plant – 100 |
Saudi Aramco |
Abqaiq Plants |
Nov-2001 |
400634–075 |
Installation of Motor Actuator HV–6669, UA |
Saudi Aramco |
Abqaiq Plants |
Feb-2002 |
400604–021 |
BI – 3141 SAPMT Site Office Services |
Saudi Aramco |
SHDGM Gas Plant |
Dec-2001 |
400623–026/ 6140062326 |
Repair Concrete Foundations, Ain Dar GOSP |
Saudi Aramco |
ADGOSP – 3 |
Apr–2002 |
6140061425 (R2) |
Waste Oil Recovery System Construction |
Saudi Aramco |
UGOSP – 9 |
Apr-2002 |
400623–026/ 6140062326 |
Repair Concrete Foundations, Ain Dar GOSP |
Saudi Aramco |
ADGOSP – 3 |
Apr-2002 |
6510010849 |
Construction of NGPD R/V Shops Building Extension |
Saudi Aramco |
Abqaiq Plants |
Dec-2002 |
400337–036 |
MSO Warehouse Roof Repairs at QSWTP |
Saudi Aramco |
QSWTP |
Sep-1993 |
400337–040 |
Remove Steel Fittings from IPS |
Saudi Aramco |
IPS Facility |
Nov-1993 |
400379–061 |
Upgrade Transformer CPRUTL |
Saudi Aramco |
Shedgum Gas Plant |
Oct-1993 |
400470–017 (R1) |
Repair Portable Clinic Building |
Saudi Aramco |
Harmaliyah Camp |
Sep-1994 |
400472–010 |
Install Smoking Stands |
Saudi Aramco |
APS – 4 & 5, Abqaiq Plants |
Oct-1994 |
400472–002 |
Ground the Smoking Stand |
Saudi Aramco |
N/Stabilizer, Abqaiq Plants |
Oct-1994 |
400479–027 (R1) |
Septic Tank & Leach Field Construction |
Saudi Aramco |
UGOSP – 8 |
Jan-1996 |
400444–099 |
Substation Foundation Repair |
Saudi Aramco |
Shedgum WIP #2 |
Dec-1995 |
47027/00 |
Construction of Internal Security Forces Quarters |
Saudi Aramco |
Hawtah Field Units |
Jul-1998 |
400540–053 |
Guardrail Posts Installation |
Saudi Aramco |
Ain Dar GOSP #4 |
Nov-1998 |
400345–014 |
Security Access Control System Installation |
Saudi Aramco |
Abqaiq GOSP–3, 4, 5 & Shdgm.–4 |
Nov-1998 |
400539–046 (R1) |
Deaerators Foundation Repair |
Saudi Aramco |
Abqaiq Plants |
Mar-1999 |
400634–016 |
Inspection Worksheet, Abqaiq Plants |
Saudi Aramco |
Abqaiq Plants |
Jan-2001 |
6510009844 |
ESD Modification |
Saudi Aramco |
Uthmaniyah Gas Plant |
Sep-2002 |
6510029358 |
Replacing SSP to RTR Piping, HGP |
Saudi Aramco |
Hawiyah Gas Plant |
Nov-2003 |
3000390768, BI-00-10-0032 |
INSTALL GAS DEHYDRATION SYSTEM, ABQAIQ PLANTS |
Saudi Aramco |
Abqaiq Plants |
Mar-2012 |
6600027475 |
MULTI TRADE AND CIVIL WORKS |
NGPD, SAUDI ARAMCO |
DHAHRAN, ABQAIQ, AINDAR, SHEDGUM, UTHMANIYAH, MUBARRAZ |
4/30/2015 |
6600028099 |
REMANIFOLDING AND PIPELINE RECONDITIONING SERVICES |
NGPD, SAUDI ARAMCO |
ABQAIQ, AINDAR SHEDGUM, UTHMANIYAH, MUBARRAZ |
3/31/2015 |
4400001910 |
DISTRIBUTION NETWORKS UP TO 36 KV AT RIYADH CITY |
SCECO, RIYADH |
RIYADH CITY |
10/31/2016 |
6510667404 |
PS-21 INTERNAL AND EXTERNAL ASPHALT WORK |
SAUDI ARAMCO |
PUMP STATION # 2 |
3/19/2015 |
6510525699 |
RELIEF VALVES (RV) REMOVAL AND RE-INSTALLATION |
SAUDI ARAMCO |
SOUTH GHAWAR |
03/09/2015 |
6510661005 |
INSTALLATION OF MPFMs AT SEVERAL SGPD FACILITIES |
SAUDI ARAMCO |
SOUTH GHAWAR |
06/30/2014 |
31133022/00 |
CONSTRUCTION OF WASIT 380/230 KV SUBSTATION, CIVIL WORKS |
ABB |
ABB JUBAIL |
7/31/2014 |
6510661796 |
DEMOLITION OF OLD FIRE STATION & CONSTRUCTION OF SECURITY FACILITIES |
SAUDI ARAMCO |
SHEDGUM NGL |
05/19/2015 |
6510941233 |
ER. COATING REPAIR FOR GAS TREAT 2 & NGL |
SAUDI ARAMCO |
SNGL |
03/02/2019 |
3000676325 |
UPGRADING GOVERNMENT SECURITY FACILITIES |
SAUDI ARAMCO |
SHPD |
06/01/2018 |
6510787417 |
GOVERNMENT SECURITY CONSTRUCTION BUILDING FOR SGPD-2 |
SAUDI ARAMCO |
SGPD |
02/21/2018 |
6510787416 |
GOVERNMENT SECURITY CONSTRUCTION BUILDING FOR SGPD-1 |
SAUDI ARAMCO |
SGPD |
12/31/2018 |
3000676365 |
UPGRADING GOVERNMENT SECURITY FACILITIES @ ADPD |
SAUDI ARAMCO |
ADPD |
JAN-2026 |
3000676364 |
UPGRADING GOVERNMENT SECURITY FACILITIES @ ABPD |
SAUDI ARAMCO |
ABPD |
Jan-2026 |
4000054924 |
DISTRIBUTION NETWORKS UP TO 36 KV IN DAMMAM |
SCECO |
DAMMAM |
08/31/2019 |
4000054915 |
DISTRIBUTION NETWORKS UP TO 36 KV IN AL -HASSA |
SCECO |
AL-HASSA |
08/31/2019 |
6510917618 |
Demolition of Udhaliyah Village |
Saudi Aramco |
Udhailiyah |
10/31/2020 |
6510917612 |
Demolition of khurais Village |
Saudi Aramco |
khurais |
10/31/2020 |
6511041611 |
REPLACE DELUGE SYSTEM PROPANE SURGE TANKS |
SAUDI ARAMCO |
SHEDGUM NGL |
06/30/2023 |
6511070525 |
REPLACE DELUGE SYSTEM PROPANE SURGE TANKS |
SAUDI ARAMCO |
SHEDGUM NGL |
02/15/2025 |